
Latent AMRs slide beneath racks or pallets, lift them, and carry them to the operator. They transform the conventional “person moves to the goods” model into Goods to Person, driving labor savings and productivity in picking operations.
Challenges solved
- Time wasted searching for goods
- Operator burden of carrying loads
- Long travel time depending on destination
Benefits
- Eliminates “search & carry” tasks
- Cuts operator walking distance
- Standardizes throughput via robotic transport
Features
Low-profile design fits narrow spaces and supports single/multi-layer racks. Widely adopted in e-commerce, retail, 3C, lithium battery, solar and automotive. SLAM/QR guidance adapts flexibly to layout changes.