Document Download

PEGASUS Pokayoke System Cover TH

PEGASUS Shipping and Receiving Inspection System Detailed Data TH ver.

This system verifies data accuracy during receiving and shipping using QR codes and barcodes, improving shipping accuracy and streamlining inspection operations.

Please download using the button below.