Document Download

PEGASUS Pokayoke System Cover EN

PEGASUS Shipping and Receiving Inspection System Detailed Data EN ver.

This system verifies data accuracy during receiving and shipping using QR codes and barcodes, improving shipping accuracy and streamlining inspection operations.

Please download using the button below.