
This system tracks materials from receipt through production and shipping at the lot and serial level — enabling fast identification of affected units when a recall is needed.
Benefits
Rapid recall response
Lot- and serial-level traceability allows fast target identification and recovery.
Unified traceability
Inbound, process and outbound history are managed in one place.
Recall progress visibility
Recovery status is visualized and managed centrally.
Quality assurance
Audit-ready records strengthen quality and trust.
Less manual handover
Replaces paper- and Excel-based handovers with reliable records.
Compatible Functions
- Barcode / 2D code reading — Captures lot and serial codes at every step.
- Cloud management — Centralizes traceability data across sites.
- No-code app builder — Adjust process and field definitions without coding.
- Device management — Centralized handheld management.