Solution 44

Equipment Rounds Inspection Paperless System

This system digitizes the inspection rounds for production equipment and utilities — capturing readings and status with a handheld terminal and feeding maintenance and energy systems.

Benefits

Paperless rounds

Operators record results directly, no paper sheet.

Faster anomaly response

Out-of-range readings alert maintenance immediately.

Lower downtime

Early detection avoids unplanned breakdowns.

Audit-ready records

Every reading is timestamped and searchable.

Compatible Functions

  • Barcode / 2D code reading — Identifies each equipment point reliably.
  • No-code app builder — Design rounds forms without coding.
  • Device management — Manage handhelds remotely.