Solution 42

GS1 Code Print Inspection System

This system reads and verifies GS1 codes on packaging — ensuring that the printed content matches the master data and meets regulatory requirements.

Benefits

Print content verification

Verifies the printed GS1 code against the master.

Regulatory compliance

Helps comply with GS1-based labeling requirements.

Defect prevention

Detects misprints before products reach the customer.

Audit-ready records

Each inspected unit is logged automatically.

Compatible Functions

  • Barcode / 2D code reading — Reads GS1 codes accurately.
  • OCR (text recognition) — Verifies human-readable text together with codes.
  • No-code app builder — Configure inspection rules on site.
  • Device management — Manage handhelds remotely.