
This system reads dispensed weights from the scale, prints a label on the spot via a mobile printer, and records the dispensing — eliminating manual transcription.
Benefits
Inline label printing
Labels print right at the dispensing station, on weight confirmation.
No manual transcription
Weights and lots are recorded digitally, not by hand.
Faster dispensing
Operators stay at the bench with no return-to-PC trip.
Traceable records
Each dispense is timestamped with operator and material.
Compatible Functions
- Mobile printer linkage — Prints labels at the dispensing station instantly.
- Barcode / 2D code reading — Reads material lot codes accurately.
- No-code app builder — Adjust dispensing screens to each line.
- Device management — Manage handhelds remotely.