Solution 38

Raw Material Receiving Verification System

This system verifies incoming raw materials with a handheld terminal — reading labels, lots and use-by dates by OCR or barcode and matching against the purchase order at the dock.

Benefits

Wrong-material prevention

Validates each delivery against the PO before put-away.

OCR-based flexibility

Reads labels even when no barcode is present.

Faster receiving

Replaces manual paper checks with on-the-spot scanning.

Quality assurance

Captures lot and use-by date together with the receipt.

Compatible Functions

  • OCR (text recognition) — Reads label text including lot and date.
  • Barcode / 2D code reading — Reads GS1 and 2D codes accurately.
  • No-code app builder — Tailor receiving screens to your process.
  • Device management — Manage handhelds remotely.