
This system replaces paper inspection sheets with handheld terminal input — capturing measurements and judgments directly into the quality database in real time.
Benefits
Paperless records
Inspection records are captured digitally with no paper handling.
Real-time visibility
Quality data is visible to supervisors immediately.
Lower overhead cost
Removes paper, scanning and transcription costs.
Audit-ready quality data
Records are timestamped and centrally searchable.
Compatible Functions
- Barcode / 2D code reading — Identifies products being inspected.
- No-code app builder — Design inspection screens without coding.
- Device management — Manage handhelds remotely.