Solution 27

OCR-based Shipping Verification System

This system uses OCR on a handheld terminal to read characters directly from shipping labels and verify them against the invoice / order — preventing shipping mistakes when no barcode is available.

Benefits

OCR-based verification

Reads existing label text directly, with no need for barcoding.

Shipping mistake elimination

Match-checks each package against the order before it leaves.

Faster verification

Removes manual transcription between paper and pack.

Audit-ready log

Every verified shipment is recorded automatically.

Compatible Functions

  • OCR (text recognition) — Reads label text directly from the package.
  • Barcode / 2D code reading — Handles barcodes when present.
  • No-code app builder — Adapt screens to the actual shipping process.
  • Device management — Remote management of fielded handhelds.