Solution 26

Shipping Kanban Verification System

This system verifies outbound parts against the shipping kanban — preventing wrong shipments at the dock and recording every shipment automatically.

Benefits

Wrong-shipment prevention

Each kanban is verified against the actual goods before loading.

Operator-independent quality

Visual checks are replaced by machine matching.

Automatic shipping log

Every verification is timestamped and stored automatically.

Customer claim reduction

Reduces the risk of wrong-part delivery and the rework it triggers.

Compatible Functions

  • Barcode / 2D code reading — Reliably reads kanban codes and item labels.
  • OCR (text recognition) — Falls back to OCR when codes are missing or damaged.
  • No-code app builder — Adapts to changes in shipping workflow.
  • Device management — Remote management of fielded handhelds.