
This system tracks work-in-progress storage locations with handheld terminals and bin labels — eliminating search time and lost inventory on the shop floor.
Benefits
No more searching
Every WIP item has a known, validated location at any time.
Reduced inventory loss
Material can no longer be misplaced between processes.
Faster throughput
Operators retrieve WIP directly, without searching.
Traceability of moves
Every move is recorded automatically for audits.
Compatible Functions
- Barcode / 2D code reading — Reads bin and item labels with high accuracy.
- No-code app builder — Adjust move workflows without programming.
- Device management — Remote management of fielded handhelds.