
This system reads kanban part numbers with OCR on a handheld terminal and verifies them against the purchase order, preventing receiving errors before parts enter the line.
Benefits
OCR-based part number recognition
Reads characters printed on existing kanbans directly, so no barcode labeling project is required.
Real-time receiving verification
Confirms each delivery against the PO immediately at the dock and flags discrepancies on the spot.
Lower dependency on individuals
Replaces visual checks with machine matching, reducing skill-based variance and training time.
Faster receiving throughput
Speeds up reception by eliminating manual look-up between paper and parts.
Compatible Functions
- OCR (text recognition) — Reads part numbers, lot numbers and dates directly without barcoding.
- Barcode / 2D code reading — Reads barcodes, QR and GS1 codes quickly and accurately.
- No-code app builder — Adjust forms and workflows on site without programming knowledge.
- Device management — Centrally manage and update fielded handhelds remotely.