PR

2025.11.19

TOMAS TECH Showcases Smart Factory, Industrial IoT and Energy Visualization at METALEX 2025

TOMAS TECH、METALEX 2025にてスマートファクトリー・産業IoT・エネルギー可視化ソリューションを展示

METALEX 2025 Exhibition Report

TOMAS TECH showcased smart factory and industrial IoT solutions at METALEX 2025, held from November 19 to 22, 2025 at BITEC, Bangkok. The demonstration introduced energy monitoring using sensors, PLC or equivalent devices, server-side data collection, and dashboard visualization. Visitors could see real-time information such as flow rate and CO2 concentration, as well as machine monitoring using tower light signals and smartwatch notifications. The solution supports manufacturers that want to improve productivity and energy efficiency through real-time visibility and data-driven improvement.