METALEX 2023 Exhibition Report
TOMAS TECH showcased its industrial IoT monitoring solution at METALEX 2023, held from November 22 to 25, 2023 at BITEC, Bangkok, in the OKAYA Thailand booth. The demonstration collected machine operating signals through PLCs and visualized status changes on an Andon-style board according to tower light colors. Alerts could be sent via LINE or smartwatch, while a connected camera enabled image data to be shared for remote confirmation and later analysis. The solution helps manufacturers detect problems earlier, respond faster, and use recorded visual data for continuous improvement.