TOMAS TECH CO., LTD. (Headquarters: Bangkok; Representative Director: Ryo Nozaki), a specialist in system development for the manufacturing and logistics sectors, has officially launched ‘PEGASUS,’ an advanced energy monitoring system designed to track and analyze the real-time consumption of critical factory energies, including electricity, compressed air, and water. This comprehensive system simultaneously enables the precise calculation and management of CO₂ emissions alongside significant cost reductions. By doing so, it provides robust support for corporate energy-saving initiatives and empowers enterprises to achieve sustainable business operations.
Detailed information regarding the energy monitoring system is provided below.
The overview documentation for the “PEGASUS” Energy Monitoring System is available for download below.
Background Behind the Launch of the “PEGASUS” Energy Monitoring System Solution
In recent years, the importance of energy conservation and CO₂ emission reduction within the manufacturing and logistics sectors has escalated on a global scale. In particular, soaring electricity and fuel costs have directly impacted corporate profitability, elevating energy efficiency from an operational concern to a critical management priority. Furthermore, with the rapid proliferation of ESG investment frameworks and carbon neutrality initiatives, enterprises are increasingly required to ensure transparent disclosure and precise management of their greenhouse gas emissions.
Despite these growing pressures, many factory floors still lack adequate “visualization” of their energy usage, which has consistently hindered companies from identifying inefficiencies and formulating effective countermeasures. To address these compounding challenges, TOMAS TECH has leveraged its extensive expertise gained on Asia’s manufacturing frontlines to introduce a comprehensive system that seamlessly integrates energy consumption visualization with actionable optimization capabilities.
Product Overview: “PEGASUS” Energy Monitoring System

■ System Name
“PEGASUS” Energy Monitoring System
■ Key Features
- Real-Time Consumption Monitoring
- Automated CO₂ Emission Calculation & Management
- Cost Analysis & Savings Optimization Support
- Comprehensive & Advanced Analytics Capabilities
- Flexible Deployment Options
The “PEGASUS” Energy Monitoring System enables factories to track and monitor utility consumption including electricity, compressed air, and water on a real-time basis. By capturing operational data at the individual equipment level, the system instantly detects peak power demand surges and triggers automated alert notifications, prompting frontline operators to take immediate corrective action.
Furthermore, PEGASUS features built-in calculation logic fully compliant with international Greenhouse Gas (GHG) Protocol standards across Scope 1, 2, and 3. It automatically aggregates CO₂ emissions categorized by specific operational classifications and manufacturing processes. This capability ensures meticulous accuracy in emissions management, seamlessly empowering enterprises to fulfill internal environmental KPIs and meet rigorous external reporting disclosures.
Additionally, by integrating electricity unit costs and production volumes, the system calculates the exact cost and CO₂ emissions per individual product unit, delivering invaluable insights for precise cost accounting and strategic pricing. Equipped with dynamic dashboard visualizations, historical data comparison analytics, and seamless Excel/CSV data export functionalities, PEGASUS addresses a diverse spectrum of organizational needs ranging from high-level executive reporting to granular frontline operational insights. Supporting both cloud-based and on-premise deployment models, the system offers the scalability and flexibility required to integrate seamlessly into facilities of any size, from small-to-medium factories to major large-scale industrial sites.
Key Benefits of Implementing the “PEGASUS” Energy Monitoring System
The key benefits of implementing the ‘PEGASUS’ Energy Monitoring System are outlined below:
- Maximizing Energy Efficiency & Conservation
- Supporting the Achievement of Environmental & Sustainability Goals
- Substantial Reduction in Operational Costs
- Fostering a Culture of Energy Awareness Among Employees
Implementing PEGASUS enables enterprises to maximize their energy conservation potential. By identifying specific operational inefficiencies at the individual equipment level, organizations can optimize equipment operating conditions and refine maintenance schedules, leading to a substantial reduction in power consumption. In practical applications, the system is projected to deliver an energy reduction of approximately 10% to 20%. Amidst the ongoing surge in global electricity tariffs, this efficiency gain translates directly into significant and measurable operational cost savings, bolstering overall corporate profitability.
Furthermore, by enabling the quantitative management of CO₂ emissions, PEGASUS empowers enterprises to make steadfast progress toward achieving their environmental targets. This data-driven approach links directly to internal KPI management and external information disclosure, ultimately strengthening corporate credibility and fostering trust in the company’s sustainable management initiatives. In addition, sharing energy data at the operational frontline level promotes a meaningful mindset shift among individual employees. This transparency effectively fosters an organizational culture centered on energy awareness, embedding sustainable and eco-friendly practices throughout the entire workplace.
Implementation Schedule for the “PEGASUS” Energy Monitoring System

- Current State Analysis & Assessment: 1 – 4 Weeks
- System Design & Engineering: 1 – 3 Weeks
- Development, Configuration & Testing: 1 – 20 Weeks
- Deployment, Training & Go-Live Support: 1 Week
The deployment process initiates with a comprehensive Current State Analysis, requiring 1 to 4 weeks to thoroughly diagnose existing energy consumption patterns. Following this, the System Design & Engineering phase is completed within 1 to 3 weeks. The Development and Testing phase spans from a minimum of 1 week to a maximum of 20 weeks, scaling according to the project’s specific scope and technical complexity. Finally, Deployment & Go-Live Support is finalized within approximately 1 week. Consecutively, this efficient framework allows the entire system to achieve official operational readiness and Go-Live in as early as one month from project commencement.
Since a phased implementation approach can be selected to align precisely with each enterprise’s specific operational and budgetary circumstances, the project can be managed with maximum flexibility tailored to the unique conditions of the production floor.
Future Outlook and Growth Plans
Moving forward, PEGASUS will expand its cloud-based and on-premise deployment configurations to drive system adoption across a broader and more diverse spectrum of enterprises. To offer an integrated solution that contributes to comprehensive factory-wide optimization, we plan to deeply strengthen interoperability with Manufacturing Execution Systems (MES) and product traceability platforms.
Furthermore, we are accelerating our market expansion across Southeast Asia specifically targeting Thailand, Vietnam, Malaysia, and Indonesia to actively support regional energy conservation initiatives and CO₂ reduction mandates. Looking to the future, the system’s roadmap includes implementing AI-driven energy supply-and-demand forecasting models coupled with automated control system integrations, ultimately empowering manufacturers to realize full-scale Smart Factory transformation.
▼Corporate Profile
- Company Name: TOMAS TECH CO., LTD.
- Headquarters: Bangkok, Thailand
- Representative: Ryo Nozaki, President & CEO
- Established: 2021
- Business Operations: System Consulting・System Design and Development・System Operation and Support Services
Official Website: https://tomastc.com
Contact Information
TOMAS TECH CO., LTD.
- Contact Person: Ryo Nozaki
- E-mail:[email protected]
- Phone Number:+66-98-271-9741
(Operating Hours: Weekdays & Saturdays 08:00-17:00) - Official Website:https://tomastc.com